“After the pilot project fell behind schedule, the coordinator eventually asked the team to look into the delays, rule out equipment failure, and come up with a revised plan.”
Which option is correct because it preserves the contextual meanings of “eventually,” “look into,” “rule out” and “come up with”?
A
In the end, the coordinator asked the team to investigate the delays, eliminate equipment failure as a possible cause, and devise a revised plan.
B
Possibly, the coordinator asked the team to monitor the delays, confirm equipment failure as the cause, and adapt the plan used in the project.
C
At intervals, the coordinator asked the team to investigate the delays, repair any equipment failure, and carry out the original plan with minor changes.
D
In the end, the coordinator asked the team to document delays, overlook equipment failure as a possible cause, and scale back the revised plan.
Seu próximo nível começa aqui
Seu desenvolvimento não pode ter limites. Garanta sua Assinatura
Ilimitada e libere uma
preparação completa com os melhores professores do Brasil.